Thursday, May 19, 2016

India Showed Dada Giri To Nepal

Nepalgunj,  Two of the country's territory, eight kilometers dasagajadekhi international kanunaanasara any physical construction to FIGS.
However, in contrast to international law Banke Eastern Region suiya Baghauda Laxmanpur Rapti river that has a concrete dam construction. The new magazine is published by Marca newspaper.

Three rounds of five hundred meters away from India dasagajadekhi bamdhasamgai kalakalava has also created a marginal embankment.
India in 1 9 80 1 9 in starting work on the dam construction was completed in 85. If marginal embankment built in 2000, is held.
22 and a half miles in length, five meters wide and five meters in height kalakalava embankments have been inundated by thousands of civilians.
India kalakalava Laxmanpur dam and embankment before making any geo-of Nepal inundation, erosion and the liquidation committee and local residents struggle without Laxmanpur bamdhapidita jagadisabahadura Singh said.



The problem so far he own more than 40 thousand hectares of land into sandy said. 60 thousand of the population are directly affected by the dam due.

Dam and river basins, stopped most marginal tatabandhale Holiya VDCs have been displaced. According to the District Natural Disaster Relief Committee holiyaka 80 percent of residents have been displaced.

Similarly, 40 percent of betahanika, Bankatti 20, Gangapur 50, Narainapur 40 and are identified as 30 percent of families have been displaced.
Laxmanpur barrage of 14 door. When the great flood and sink to his country because of the terrain will turn India has closed the door barrage.
Nepali reluctant to open the door asked the secretary of the CPN-UML, said Ratna Khatri. "The people of your country to be unsafe if they looked to fend despite India became open the door," he said, because of the time of stay locked door Nepali land has been inundated. "

No comments:

Post a Comment